
Remember four and a half years ago, when we redid the master bathroom? Quite possibly not, as I doubt there are a ton of you who have been around that long. Well, it doesn’t matter, because we’re doing it again! Turns out that the new/old shower leaked. A lot! Which was the whole reason we redid it in the first place– because the first shower leaked, and we replaced it, and now the second shower has leaked, possibly worse than the first one did, and now we’re replacing that, and I’m down a bathroom again for, hopefully, just a few days. They’re telling us they’re going to be done by Monday, assuming everything shows up– we’re still waiting on the door and the flooring but that should be in tomorrow or Saturday, and it’ll be the last stuff to get done anyway, so it shouldn’t be a problem.
The flooring this time will extend into the laundry room, off there to the left, and we’re keeping the same vanity and cabinet and mirror and toilet and bidet we had before, and we are hoping not to have to repaint. We have gone with a built-in shower because I hate tile eternally and forever; I love the fact that the only tile in this house that has held up is the tile that I installed, in the hallway bathroom, and by “I love the fact” I need you to understand that I hate tile and I hate grout and I will hate them until twelve years after I die. At any rate, we’ll see how the new look for the shower works with the new floor tile (it’s not tile, it’s vinyl rectangles, but whatever) and then we’ll see if we need to do anything else with color to pull the room together. I’m worried that the room is going to look a little mismatched with the dark woods but no more dark tile.
At any rate, expect me to be screaming into the abyss for the next few days.
(Oh, also, summer school is finished as of today, so I’m on For Real For Real Summer Break now for the next month or so.)
Discover more from Welcome to infinitefreetime dot com
Subscribe to get the latest posts sent to your email.