Rebathroomed!

As you can see from the strip of unmudded, unpainted drywall and the conspicuous lack of a shower door, we’re not quite done– the shower door is running late and should be here later this week, and they’ll take care of that part of the wall and a couple of other very minor tasks at that time. But I’d say we’re 90% done, and we threw a shower curtain on a tension rod on there so that we can shower in 24 hours after everything finishes curing, and the new floor is completely done.

So, progress? I’ll take it. Now we just have to figure out how to tie everything together, because the existing towels and bathroom mats and art on the walls do not work nicely with the blue in the new shower surround. But hopefully this fucker won’t leak.

Terrible Decisions: The Rebathroomening, Day 2

So, today involved:

  • New subfloor in the bathroom and putting in most of the drywall;
  • Pulling up the vinyl in the laundry room to discover the enormous extent of the water damage in there (and I’m pretty sure those are asbestos tiles);
  • Pulling the washer, dryer, and slop sink and getting rid of the rest of the vinyl, then cutting out the damaged subfloor;
  • Installing the new, one-piece shower pan. I dare you to soak through that, water!

Two more days, supposedly, and given how fast they’ve been working (and that the new flooring showed up today) I’m pretty convinced* that it’s actually going to happen. They’re not working on Sunday, but we ought to be done on Monday.

(*) crossing fingers

TERRIBLE DECISIONS: Not this crap again

Remember four and a half years ago, when we redid the master bathroom? Quite possibly not, as I doubt there are a ton of you who have been around that long. Well, it doesn’t matter, because we’re doing it again! Turns out that the new/old shower leaked. A lot! Which was the whole reason we redid it in the first place– because the first shower leaked, and we replaced it, and now the second shower has leaked, possibly worse than the first one did, and now we’re replacing that, and I’m down a bathroom again for, hopefully, just a few days. They’re telling us they’re going to be done by Monday, assuming everything shows up– we’re still waiting on the door and the flooring but that should be in tomorrow or Saturday, and it’ll be the last stuff to get done anyway, so it shouldn’t be a problem.

The flooring this time will extend into the laundry room, off there to the left, and we’re keeping the same vanity and cabinet and mirror and toilet and bidet we had before, and we are hoping not to have to repaint. We have gone with a built-in shower because I hate tile eternally and forever; I love the fact that the only tile in this house that has held up is the tile that I installed, in the hallway bathroom, and by “I love the fact” I need you to understand that I hate tile and I hate grout and I will hate them until twelve years after I die. At any rate, we’ll see how the new look for the shower works with the new floor tile (it’s not tile, it’s vinyl rectangles, but whatever) and then we’ll see if we need to do anything else with color to pull the room together. I’m worried that the room is going to look a little mismatched with the dark woods but no more dark tile.

At any rate, expect me to be screaming into the abyss for the next few days.

(Oh, also, summer school is finished as of today, so I’m on For Real For Real Summer Break now for the next month or so.)

TERRIBLE DECISIONS: Almost there

Substantial progress in the last couple of days:

A good look at the flooring, which is completely installed, and the wall color, which is a light grey. I love how this turned out. Love it.

This is the shower, which gets tiled tomorrow, and the fan/lighting sconce overhead. Nice and simple.

The niche and the bench. We’re using a different shelf than the one that’s sitting in there; it’s got holes in it for drainage and is considerably thinner.

The hardwood in the bedroom is a freaking mess, but I love that the transition pieces match the flooring. I don’t know if I should have expected this but I love it as a little detail.

And the first parts of the tile are in! This literally just happened; it was the last of the work for today as this needs to set before they can tile the rest of the shower tomorrow. The wall tiles will be a lot bigger, with an accent stripe going underneath all the shower hardware and more accent tile inside the niche. The grout here will be black; we were going to go with black everywhere but the tile guy thinks it has a good chance of bleeding into the accent tile, which is more the color of the floor, so we might go with white there.

The rest of the shower gets tiled tomorrow, and then all that’s left is trim, the toilet and bidet, the vanity, the closet, the hangers and shelving, grout, and finishing up the last details on the electric. Oh, and the shower door. That’s kind of important. I think they’re planning on working through the weekend, so we should be done Tuesday or Wednesday. I cannot wait to see what the shower looks like.

TERRIBLE DECISIONS: Crop THIS shit, goddammit

Still need to do some cleaning and put the furniture back, obviously, but I believe a BOOM! may be in order here.

BOOM!

TERRIBLE DECISIONS: In which I carefully crop photos

Done!

… AS FAR AS YOU KNOW.

TERRIBLE DECISIONS: bluuuuuue

Underlayment is down.  Now for the actual floor.

STAGE ONE COMPLETE 

A bit of luck– as we guessed, there’s a sizeable gap under the baseboards now that the carpet is out, so we don’t need to pull them.  Lunch break, then underlayment, which should be fast.