
That slight pinkish hue is how we know that the drywall compound hasn’t finished drying yet; this needs another sanding before it’s ready to paint, but considering how it looked a couple of weeks ago this represents significant improvement. We meant to get this done last weekend but neither of us were feeling well so it got put off to yesterday and today; I capped off that loose wire and stuck it into a box (It meets code now! It’s even straight and flush to the wall!) and we both pitched in on the sanding. Bek did the mudding. Hopefully next weekend we’ll get to throw some furniture around, and then there’s a dumpster coming for the first few days of Spring Break, during which I will have to be restrained from throwing away everything we own. Do we need a dining table? The oven? Come on, let’s just put ’em in the dumpster.
Seriously, we have like half a dozen projects planned for Spring Break (most of them involve destroying stuff, which is exciting!) plus a handful of contractors and other specialists coming out to either take care of other things we’re not smart enough for or give us estimates for them. If we get more than half of the shit we’re thinking about taken care of it’s going to be a very successful Spring Break.
My other project today was … filling a hole in front of the house, which may be a post all on its own. I never realized that it was possible to be bad at filling in a hole, or to fill in a hole incorrectly, but I appear to have done both of those things. One way or another the current phase of the Fill The God Damn Hole project is complete; the only question is whether we need to move to Fill The God Damn Hole, Phase 3: In Which I Learn to Pour Concrete, Because Fuck This.
Discover more from Welcome to infinitefreetime dot com
Subscribe to get the latest posts sent to your email.