Before

Pictured: the mess of pipes that had not one but two different water softener people swearing at the level of redundancy and poor decision-making required to have installed it in the first place. To the right is the ancient previous water softener, which has not been active since we moved into the house. My understanding is that several of these pipes are going to go away tomorrow to be prefaced with something more streamlined and sensible.

Also tomorrow: the roof gets ripped off of the house. Here’s what the roof currently looks like:

I mean, okay, that’s more a picture of a storm on its way than the roof, but who takes pictures of their roof? Nobody. I figure they’ll at least get to the part where that’s torn off tomorrow; I don’t have a firm idea of how long this entire process is supposed to take, but I assume sometime in the next few days I’m going to have a new roof and new eaves and all that fun stuff.

The roofers are supposed to be here by 7:30 in the morning and the softener guys are here before 10, so I gotta get up early to get all water-using tasks out of the way before they arrive, and also to keep the roofers from taking up the entire driveway, since I’d like the water guys to not have to cart pipes from halfway across the world before taking them into the basement. It’s going to be a long, expensive day tomorrow, but hopefully I’ll have some neat pictures to share with you by tomorrow night.

Published by

Luther M. Siler

Teacher, writer of words, and local curmudgeon. Enthusiastically profane. Occasionally hostile.

One thought on “Before

Comments are closed.